D.L.P. Services, Inc. is licensed to handle any sealed radionuclide. This allows us to work with projects, operations and electrical to prepare for proper installation of source or sources. We walk the job through for full understanding source location. Then with the coordinated effort of our customer, the installation process can begin. Our Field Technicians will verify all fields are at safe levels. The source is then removed from its crate and placed in designed location. Once secured, the shutter door assembly is placed in the open position. A survey is then performed at the source and its detector location to verify proper strength and alignment. Any adjustments will be made at this time. Once all alignments are verified a wipe test is performed and sent for analysis. All documentation is presented to the Radiation Safety Officer, (R.S.O.).

DLPServices